Our MOQ is 1 set. Lead time varies based on specific production line models. The standard lead time is 40 working days, and the loading port is Shanghai.
Our PVC pipe extrusion production line is designed to manufacture various specifications of PVC pipes for water supply, drainage and cable conduit. The complete line consists of conical twin screw extruder, mould, vacuum sizing box, haul-off machine and cutting machine. We support customized equipment configuration according to pipe diameter, wall thickness and production output requirements.








